VPP programs in Australian Capital Territory (3 open)

3 of the 11 programs we track are open to Australian Capital Territory households. Sources checked 19 Oct 2026 – 17 Nov 2026.

Every program we track that lists Australian Capital Territory availability. State availability is an initial screen — providers may apply postcode or network checks we don’t model.

Preset: VPPs in Australian Capital Territory×

How would you like to be paid?

All 3 programs, A–Z

3 of 8 open programs list Australian Capital Territory.

Order: A–Z. No paid placement. Credits are not total savings; plan rates are separate, and a retailer switch may not be needed.

ActewAGL

Battery Power Top-Up

ACT · south-east NSW

Joining credit
Up to $100one-off

Up to, conditions apply

Ongoing credit
$240/yr

Published amount

Event pay
Not offered
Conditions

Joining credit: $100 only for customers new to ActewAGL VPP in any capacity and registering this eligible battery for the first time; existing electricity customers may qualify.

Ongoing credit: Standard Top-Up credits accrue daily. Sign-up eligibility and sibling offers are explained on the program page.

Top-Up Bonus sibling option adds $80/yr for 3 years toward the battery price when bought through an approved Electrify with ActewAGL installer; the 1 July 2026 agreement says only one of Top-Up, Top-Up Bonus or Battery Saver may be accepted

Battery Saver plan sibling option swaps cash credits for a roughly halved supply charge and a higher feed-in tariff

Standard Top-Up credits accrue at 65.7534c per eligible day (approximately $240/year); the $100 signup credit requires first-time VPP participation and battery registration.

Electricity plan:
You need an ActewAGL electricity account at the address; your existing rates and feed-in tariff stay, and energy the battery uses is still billed. Credits come off your bill and cannot be paid out as cash.
Electricity retailer:
Provider electricity account required
Battery reserve:
Unknown
Annual dispatch limit:
Unknown
Control:
ActewAGL (via the Evergen platform) may charge, discharge or hold the battery at its absolute discretion; events can happen at any time, often during 7–9am and 5–8pm demand peaks. The battery must allow grid charging and export, and the maximum backup level must be at or below 20%. If the product has backup power, the agreement says ActewAGL will not allow a VPP discharge to reduce stored energy below the applicable usable-energy-storage level specified for that product; the current compatibility table lists a 20% minimum state of charge for every listed battery. Confirm the exact approved battery/inverter pairing. No dispatch app and no per-event opt-out. The Top-Up term is 12 months and auto-renews; termination requires at least 14 days' notice before the term end, or 30 days' written notice for convenience during the term. No exit fee applies to Top-Up. On renewal, ActewAGL may vary terms including credits, fees or charges with 30 days' notice. Government-credit rights arising from the services are assigned to ActewAGL. Opt out per event: No

Listed battery families

  • Tesla Powerwall · Not Powerwall 3AC
  • SolarEdge Home Battery
  • AlphaESS SMILE · Not SMILE-G3 BAT-9.3S
  • Sungrow SBR
  • Sigenergy SigenStor
  • Sungrow SBH

The FAQ's compatibility tables (re-checked 16 November 2026) list Tesla Powerwall 2 and Powerwall 3 (no Powerwall 3AC); AlphaESS SMILE-G3-BAT-4.0S and SMILE-G3-BAT-10.1P with older SMILE models, but not SMILE-G3-BAT-9.3S; and Sungrow SBH100 through SBH400, SBP4K8 and SBR064 through SBR256. LG RESU is not recorded as compatible: the LG table lists the LG RESU 16H, RESU 10H and RESU 7H only with SolarEdge HD-Wave, Genesis, StorEdge and Energy Hub inverters, and LG's Australian inverter list for the RESU Prime names no SolarEdge inverter, so a RESU Prime on an LG-listed inverter doesn't match ActewAGL's battery and inverter pairs (the low-voltage RESU12 isn't listed either). The Sungrow table also names the SH6.0RT, SH8.0RT and SH5K-30 inverters, which Sungrow's May 2026 SBR and SBH cross-reference chart doesn't list for either battery, so confirm those pairs with Sungrow too. SolarEdge is listed at family level only, because the list gives only the product name "SolarEdge Home Battery", which doesn't show whether the Home Battery 400V line is meant. Both battery AND inverter must be on ActewAGL's compatibility list; one battery per address; site export limit of at least 5 kW; hardwired ethernet or Wi-Fi internet (mobile/SIM not acceptable as primary); AC-coupled installs need a dual-channel meter.

A family listing does not confirm every model or inverter. Final eligibility rests with the provider.

Fees: Membership, setup: Not stated — ask before joining · Exit: No fee

Term: 12 months · Checked 21 Oct 2026 · Sources

Amber

SmartShift

NSW · VIC · SA · ACT · QLD (Energex)

Joining credit
Not offered
Ongoing credit
Not offered
Event pay
Market-linked

No fixed rate

Conditions

Event pay: wholesale price, up to ~$19/kWh · You earn the live wholesale price on every exported kWh, with no earnings cap; the advertised up-to-$19/kWh is an example of a possible spike rather than a guaranteed rate. SmartShift also charges your battery when prices are cheap or negative.

Variable wholesale export earnings No fixed amount: automation trades at market prices, with no fixed export rate or guaranteed return.

Exports earn the live wholesale price — there is no fixed feed-in tariff

SmartShift charges your battery from the grid when wholesale prices are cheap or negative

Electricity plan:
The $25 monthly membership (about $300 a year) is on top of electricity, network and other charges, so compare your whole yearly bill, not export earnings alone. Amber states it charges no exit fee, and no setup fee is stated.
Electricity retailer:
Provider electricity account required
Battery reserve:
Unknown
Annual dispatch limit:
Unknown
Control:
A guaranteed opt-out for every dispatch is not offered: temporary app controls remain available where supported, but provider overrides and Tesla group dispatch can still apply. SmartShift automates charge/discharge against wholesale prices and offers app controls where supported. Its published direct-discharge floor is 25%; a higher manufacturer reserve takes priority. Current terms permit temporary overrides during extreme market or weather events, require at least 90% internet accessibility, prohibit competing optimisation, and limit Amber-directed cycling to twice per 24 hours. Cancellation requires at least 14 days written notice and control may continue during unenrolment. Technology/API fees may apply when notified. Amber’s Tesla notice warns that five-minute group dispatch during price spikes can also affect systems with SmartShift disabled or a manual override active; confirm current model-specific behaviour. The NSW VPP rebate has separate terms, including a term of at least 12 months subject to termination rights. Opt out per event: No

Listed battery families

  • AlphaESS SMILE
  • Anker SOLIX X1
  • BYD Battery-Box Premium
  • FoxESS Battery
  • Neovolt BW-BAT
  • Sigenergy SigenStor
  • SolarEdge Home Battery
  • Sungrow SBR
  • Sungrow SBH
  • Tesla Powerwall · Not Powerwall 3AC
  • GoodWe ESA
  • Enphase IQ Battery
  • Fronius Reserva

Use the live SmartShift Compatibility Checker for the exact battery, inverter, firmware and serial number. The official list (article last edited 23 September 2026, re-checked 16 November 2026) also names GoodWe (ESA Series only, not every GoodWe system), Enphase batteries with an IQ 7 or IQ 8 inverter, and Fronius Reserva batteries with GEN24 series inverters. Amber’s list is a brand list with qualifiers, not a model list, so brands are recorded at family level, except where a qualifier names a model or series: the list names the Reserva, the only Fronius battery line we catalogue; “GoodWe (ESA Series)” names the ESA; “BYD HVM or HVS series battery, with a Fronius Primo or Symo GEN24 series inverter” names both BYD lines we catalogue, which BYD’s compatible-inverter list (V2.22, October 2026) pairs with the Symo GEN24 Plus (HVS 2–5 modules, HVM 4–8) and Primo GEN24 Plus (HVS 2–3, HVM 4–7); and “Tesla Powerwall 2 & 3” names Powerwall 2 and Powerwall 3 but not Powerwall 3AC, with an asterisk asking Powerwall 3 owners to check the Compatibility Checker for specifics; on 17 November 2026 the Checker rated Powerwall 3 partially compatible, with battery control but no control of solar on Powerwall 3’s own inverter. Amber is recorded as naming those lines. Sungrow is listed by brand, with a pointer to Amber’s Sungrow FAQ and no battery model named, so since 16 November 2026 we show it for both Sungrow battery lines we catalogue, SBR and SBH. LG is not recorded: the list reads “LG Chem with SolarEdge inverter/s”, and LG’s Australian inverter lists for the RESU Prime and for the low-voltage RESU12 name no SolarEdge inverter, so neither LG battery line we catalogue matches that pairing. Amber’s 1 October beta guidance lists 1KOMMA5°, Anker, Enphase, FoxESS, GivEnergy and GoodWe as open beta: missed commands, connectivity interruptions and paused automation are possible. Victorian Emergency Backstop and SA Flexible Exports compliance may delay enrolment for affected systems. Brand inclusion is not installation approval. Redback is excluded for new enrolments: Amber’s specific 30 July 2026 notice stops new registrations despite its general compatibility list still naming Redback. Existing connections may continue, with limited support and no assurance of long-term stability.

A family listing does not confirm every model or inverter. Final eligibility rests with the provider.

Fees: Membership: $25/month (Additional charges may apply) · Setup: Not stated — ask before joining · Exit: No fee

Term: No minimum term · Checked 19 Oct 2026 · Sources

Origin Energy

Loop · Battery Lite

NSW · SA · VIC · QLD · ACT

Joining credit
Up to $200one-off

Up to, conditions apply

Ongoing credit
Not offered
Event pay
$1/kWh

On up to 200 kWh a year

Conditions

Joining credit: $200 only for first-time Origin Loop VPP customers; claimed once, including across different Loop products. Credited to the next bill, normally within 1–3 months after connection.

Event pay: capped at 200 kWh/yr · $1/kWh for energy your battery sends to the grid in Loop events, paid on up to 200 kWh a year (at most $200 at today's rate). Origin may change the rate with notice.

Your existing plan's feed-in tariff continues on ordinary solar exports

Electricity plan:
You need an Origin electricity plan; an existing Origin plan does not need to change. Battery Lite has no minimum term or exit fee, and you can leave with 20 business days' written notice; Origin's separate installed-battery offers have 60-month terms and exit fees.
Electricity retailer:
Provider electricity account required
Battery reserve:
Unknown
Annual dispatch limit:
200 kWh/year · also caps event pay
Control:
Origin may remotely charge, discharge or hold the battery at any time and requires control availability for at least 90% of each month. Its terms aim to leave approximately 20% charge (except systems fitted with a SwitchDin node); this is not a universal minimum guarantee. The Battery Lite FAQ guarantees at least 20% specifically for Powerwall 2 and says Origin will not access the battery for VPP dispatch during blackouts. No per-event opt-out. Origin warns that charge/export scheduling in the battery app is disabled for ESY Sunhome, FranklinWH and Sigenergy while enrolled. The Origin app shows usage and exports. Opt out per event: No

Listed battery families

  • AlphaESS SMILE · Not SMILE-G3 BAT-9.3S
  • Anker SOLIX X1
  • FoxESS Battery · Not Power Cube, EQ5500 or EP12 Plus
  • FranklinWH aPower X · Not aPower X-02
  • GoodWe Lynx Home
  • GoodWe ESA
  • LG Energy Solution RESU
  • Neovolt BW-BAT
  • SAJ B2 home battery
  • Sigenergy SigenStor
  • SolarEdge Home Battery
  • SolaX Power Triple Power T-BAT H
  • Sungrow SBR
  • Tesla Powerwall · Not Powerwall 3AC

Origin publishes separate Battery Charge and Battery Lite approved-model lists. The Battery Lite list (re-checked 16 November 2026) names the 14 families recorded here, including GoodWe ESA Series, plus 1KOMMA5, Ambrion, Energizer, ESY Sunhome, Eveready, GivEnergy, Goanna and Hive outside this catalogue. Its Sungrow models are SBR064 to SBR256, SBP4K8 and SBH100, SBH150 and SBH250 to SBH400, with no SBH200. Both battery and inverter must qualify. Origin's own words are "If you don't see your battery and inverter ... email us", so a model that is not on its list needs Origin's confirmation. Lines are narrowed to the models the Battery Lite list names (re-checked 16 November 2026): it has no AlphaESS SMILE-G3-BAT-9.3S, FoxESS EQ5500, EP12 Plus or Power Cube, FranklinWH aPower X-02-AU or Powerwall 3AC; "AC Powerwall" is read as Powerwall 2, because Origin's own Battery Lite FAQ guarantees a reserve for Powerwall 2 and ENGIE's list says "AC Powerwall 2". SolaX is listed at family level only: the list names the "T-BAT H 5.8 V2", but its "T-BAT H" and "T-BAT-SYS-HV" entries do not show whether the V3 or 3.0 V2 lines are covered, and a line-level entry has to classify every SolaX line. Origin warns that Battery App charge/export settings are switched off while enrolled for ESY Sunhome, FranklinWH and Sigenergy batteries. Confirm these controls before joining, particularly if you plan to schedule exports yourself. Minimums: 5 kWh battery, 5 kW operational solar, smart meter and reliable Wi-Fi; no life-support at the premises and no other VPP. The separate partner offer is for Solar Battery Group-installed systems.

A family listing does not confirm every model or inverter. Final eligibility rests with the provider.

Fees: Membership, setup: Not stated — ask before joining · Battery Lite exit fee: No fee (Incentive-linked terms can differ)

Term: No minimum term · Checked 21 Oct 2026 · Sources

Browse other views

Choose how to browse. Each link shows the number of open programs listed for that state or battery family.

Closed to new members

Kept here for existing customers and anyone checking an older offer.

  • Nectr Evolve VPP

    Nectr's VPP is closed to new customers — its Plan BEE credit offer ($20/month conditional bill credit for a year) ended 30 June 2025, comparison sites listed it as unavailable by May 2026, and the program page has since been removed. Exact closure date and terms for remaining members are unknown.

  • Tesla Energy Plan (Tesla VPP)

    Tesla's Powerwall-only VPP with retailer Energy Locals closed on 30 September 2025 — it had stopped taking new customers well before that. Historically it offered time-of-use pricing, grid-support credits worth about $220/yr and extended warranty; remaining members were moved to Energy Locals' standing offer and regained full app control of their Powerwall.

How we compare

Provider payments and costs are recorded separately from published terms, with dates and sources. Missing provider terms stay Unknown rather than being treated as zero, and we do not accept payment for placement.

New to VPPs? Learn how a virtual power plant works.

How we compare

Common questions

Do I get paid more if my battery is bigger?

Only in programs that pay per kWh dispatched (up to their cap), or that set their credit by system size. A flat monthly or annual credit pays the same regardless of battery size.

What is a dispatch cap?

The maximum energy the operator may draw from your battery in a year. It limits battery use. Where a program pays only on energy up to that same limit, it also caps event pay; where the published terms state no total payment cap, the dispatch limit does not create one. Each program page says which applies.

Why do most programs need an account with the provider?

The operator may need to be your energy retailer to settle dispatched energy on your bill. If you already use that retailer, a switch may not be needed. If you must switch, check the underlying plan's rates too.

Will a VPP work for me?

It helps if your battery comfortably covers your own evening use first, so the energy a program draws is genuinely spare. A larger battery, or one that is rarely empty by morning, has more room to earn. A small battery on a program that requires switching to expensive rates can leave you worse off.

Do I need a smart meter?

Most programs do. Expect a meter exchange if you still have a basic meter, and confirm with the provider before you sign up.