ActewAGL Battery Power Top-Up
Operated by ActewAGL
ActewAGL's BYO-battery VPP option pays a flat $240/yr in bill credits (plus a $100 sign-up bonus) with no per-event payments. Two sibling options exist — a purchase-linked Top-Up Bonus (+$80/yr for 3 years) and the Battery Saver plan (halved supply charge instead of credits) — and you can hold only one. NSW availability is ActewAGL's south-east footprint only.
- ACT
- NSW
At a glance
- Signup
- Up to $100one-off$100 only for customers new to ActewAGL VPP in any capacity and registering this eligible battery for the first time; existing electricity customers may qualify.
- Ongoing
- $240/yr
- Events
- Not offered
- Costs
- Not stated — ask before joining
- Min reserve
- Unknown
- Retailer
- Provider electricity account required
Eligibility checklist
- An ActewAGL electricity account for the addressSource: ActewAGL VPP Services Agreement AAR2146 (effective 1 July 2026)
- Battery and inverter both on ActewAGL's compatibility list, with one battery per addressSource: ActewAGL Battery Power Top-Up (credits, compatibility, sign-up bonus)
- A smart meter; AC-coupled systems also need a dual-channel meterSource: ActewAGL Battery Power Top-Up (credits, compatibility, sign-up bonus)
- Hardwired or Wi-Fi internet (a mobile SIM is not accepted as the main connection)Source: ActewAGL Battery Power Top-Up (credits, compatibility, sign-up bonus)
- A site export limit of at least 5 kW, with grid charging and export allowedSource: ActewAGL Battery Power Top-Up (credits, compatibility, sign-up bonus)
- Battery backup reserve set at or below 20%Source: ActewAGL VPP Services Agreement AAR2146 (effective 1 July 2026)
Anything not listed is not stated in the published terms we recorded; it does not mean there is no minimum. The provider decides eligibility for your address and equipment. Sources and check dates
Still choosing a battery size? Our battery size calculator estimates the usable kWh your evening use and spare solar can support.
Compensation
Each component listed separately. One-off, per-period and per-kWh amounts are never added together.
Paid once as a bill credit after your battery is connected and commissioned.
Applied as a bill credit for every period you stay in the program, whether or not events are called.
No per-kWh dispatch payment is made — value is delivered through the credits above.
The program adds no feed-in premium; exports are paid at the underlying plan's standard rate.
- Top-Up Bonus sibling option adds $80/yr for 3 years toward the battery price when bought through an approved Electrify with ActewAGL installer; the 1 July 2026 agreement says only one of Top-Up, Top-Up Bonus or Battery Saver may be accepted
- Battery Saver plan sibling option swaps cash credits for a roughly halved supply charge and a higher feed-in tariff
- Standard Top-Up credits accrue at 65.7534c per eligible day (approximately $240/year); the $100 signup credit requires first-time VPP participation and battery registration.
Costs & fees
Anything payable by you, shown in the cost treatment beside the credits above. Where nothing is charged we say so explicitly.
Not stated in the provider's published terms, so ask before joining. We never treat a missing fee as zero or free.
Not stated in the provider's published terms, so ask before joining. We never treat a missing fee as zero or free.
Not charged by this program.
You need an ActewAGL electricity account at the address; your existing rates and feed-in tariff stay, and energy the battery uses is still billed. Credits come off your bill and cannot be paid out as cash.
The underlying plan’s rates are not part of this comparison — compare them separately.
Full terms and sources
Must hold an ActewAGL Electricity Sale Contract for the supply address, with smart meter, eligible battery/inverter, grid-charge and export capability. Top-Up keeps the customer's existing rates and feed-in tariff; all battery operation energy charges remain payable under that contract. The provider estimates VPP bill impact at no more than $50/year incl. GST, but this estimate does not apply to demand-charge tariffs or battery modes other than self-consumption. Credits are GST inclusive, bill-only and not cash redeemable.
Sources and check datesRequirements & lock-ins
What you agree to, and the limit on how much energy the operator may take.
- Contract length
- 12-month term
- Electricity account & required plan
- Provider electricity account requiredYou need an ActewAGL electricity account at the address; your existing rates and feed-in tariff stay, and energy the battery uses is still billed. Credits come off your bill and cannot be paid out as cash.
Full terms and sources
Must hold an ActewAGL Electricity Sale Contract for the supply address, with smart meter, eligible battery/inverter, grid-charge and export capability. Top-Up keeps the customer's existing rates and feed-in tariff; all battery operation energy charges remain payable under that contract. The provider estimates VPP bill impact at no more than $50/year incl. GST, but this estimate does not apply to demand-charge tariffs or battery modes other than self-consumption. Credits are GST inclusive, bill-only and not cash redeemable.
Sources and check dates - Minimum battery reserve
- Unknown
- Dispatch cap
- Unknown
- Federal Cheaper Home Batteries Program
Listed because this program can be combined with the scheme — eligibility for the scheme itself is decided by the scheme, not the provider.
Compatible systems
Battery products the provider lists as supported. Some require a specific inverter pairing.
- Tesla PowerwallNot Powerwall 3AC
- SolarEdge Home Battery
- AlphaESS SMILENot SMILE-G3 BAT-9.3S
- Sungrow SBR
- Sigenergy SigenStor
- Sungrow SBH
The FAQ's compatibility tables (re-checked 16 November 2026) list Tesla Powerwall 2 and Powerwall 3 (no Powerwall 3AC); AlphaESS SMILE-G3-BAT-4.0S and SMILE-G3-BAT-10.1P with older SMILE models, but not SMILE-G3-BAT-9.3S; and Sungrow SBH100 through SBH400, SBP4K8 and SBR064 through SBR256. LG RESU is not recorded as compatible: the LG table lists the LG RESU 16H, RESU 10H and RESU 7H only with SolarEdge HD-Wave, Genesis, StorEdge and Energy Hub inverters, and LG's Australian inverter list for the RESU Prime names no SolarEdge inverter, so a RESU Prime on an LG-listed inverter doesn't match ActewAGL's battery and inverter pairs (the low-voltage RESU12 isn't listed either). The Sungrow table also names the SH6.0RT, SH8.0RT and SH5K-30 inverters, which Sungrow's May 2026 SBR and SBH cross-reference chart doesn't list for either battery, so confirm those pairs with Sungrow too. SolarEdge is listed at family level only, because the list gives only the product name "SolarEdge Home Battery", which doesn't show whether the Home Battery 400V line is meant. Both battery AND inverter must be on ActewAGL's compatibility list; one battery per address; site export limit of at least 5 kW; hardwired ethernet or Wi-Fi internet (mobile/SIM not acceptable as primary); AC-coupled installs need a dual-channel meter.
Compatibility is an initial screen from the provider's published lists — final eligibility sits with the provider.
How control works
Who decides when your battery discharges, and what you keep a say over.
- Who dispatches
- ActewAGL (via the Evergen platform) may charge, discharge or hold the battery at its absolute discretion; events can happen at any time, often during 7–9am and 5–8pm demand peaks. The battery must allow grid charging and export, and the maximum backup level must be at or below 20%. If the product has backup power, the agreement says ActewAGL will not allow a VPP discharge to reduce stored energy below the applicable usable-energy-storage level specified for that product; the current compatibility table lists a 20% minimum state of charge for every listed battery. Confirm the exact approved battery/inverter pairing. No dispatch app and no per-event opt-out. The Top-Up term is 12 months and auto-renews; termination requires at least 14 days' notice before the term end, or 30 days' written notice for convenience during the term. No exit fee applies to Top-Up. On renewal, ActewAGL may vary terms including credits, fees or charges with 30 days' notice. Government-credit rights arising from the services are assigned to ActewAGL.
- Mobile app
- App control: No
- Opting out
- Opt out per event: No
Sources
Every figure above comes from these pages, each dated the day we last read it.
- ActewAGL Battery Power Top-Up (credits, compatibility, sign-up bonus)www.actewagl.com.au/energy-plans/battery-power-top-upProgram pageChecked 16 Nov 2026
- ActewAGL VPP Services Agreement AAR2146 (effective 1 July 2026)www.actewagl.com.au/virtual-power-plant-services-agreementTerms (PDF)Checked 21 Oct 2026
- ActewAGL Battery Saver energy plan (sibling option)www.actewagl.com.au/energy-plans/battery-saverProgram pageChecked 21 Oct 2026
